European Industrialpark
0574-63077604
  1. Home > About Us > Basic Support Facilities

10 billion yuan has been invested in the new zone to construct the road, electricity supply, water supply, communications, heating, sewage treatment and other necessary public facilities needed by the development of enterprises in the area of nearly 65 square kilometers.


[Road]
Construct main road framework according to the requirement of layout and function and up to 2011, there have been 51 roads constructed with a total mileage of 138 km, Including 40 roads and 66 bridges in industrial block, basically built up the main frame of road network of "eight horizontal and nine vertical"; The framework infrastructure focus on "one horizontal and four vertical" around Central Lake of business new city processes in order, completing the construction of 11 roads and 23 bridges, forming road network framework of "four horizontal and seven vertical".

1-19102914220V05.jpg


1-19102914311TG.jpg

[Power supply]
To 2011, 5 power substations were built: Lianhua substation of 220 kv, Binhai Substation of 110 kv, Bailu Substation of 110 kv, Yueci Substation of 110KV and Haixing Substation of 110K, the total power supply capacity is 860000 kva, with total power supply of 1.53 billion kilowatt hours; The annual power supply capacity of Zhongmao Hangzhou Bay Heat Power Co., Ltd is 25 million volt ampere. In June 2010, Hangzhou Bay Power Supply Bureau of Ningbo Electric Power Bureau was established.



[Water supply]
Industrial water is mainly supplied by Hangfeng Water Plant of Hangzhou Bay New Zone. In April 2004, the first phase of Hangfeng Water Plant was constructed in the northwest of Sizaopu Reservoir, taking an area of 11.33 hectares and is put into production in December with daily water supply capacity of 50000 tons from the Sizaopu Reservoir and Caoe River under construction. The second phase of Hangfeng Water Plant was constructed in December of 2010 with daily water supply capacity of 100000 tons. In 2011, the water supply special line from Cixi Chengbei Water Plant to leisure and services section had been completed and put into service, Zhongwan special line of water supply was opened and contract was signed with Cixi Tap Water Company to realize the conversion of high-qualified water for the leisure and service section and 10 administrative village to the east of Luzhong Bay.

1-191029144625J9.jpg


1-191029144132557.jpg

[Communication]
To 2011, about 120 km of pipe network of cellular mobile has been completed. There are 40 mobile base stations and 12 telecom module bureaus as well as 16 telecom module access rooms in the area.


[Heating]
Ningbo Zhongmao Thermal Power co., LTD. is in the charge of heat supply and the first and second phases have installed 4 furnaces and 3 machines and the installed capacity is 42mw. By the end of 2011, the average supplied heating will reach 158 tons per hour and the maximum heating capacity is up to 310 tons per hour, and central heating supply would be implemented in 98 household thermal enterprises in the new zone. The installation of the third phase is 3 furnaces 3 machines and the installed capacity is 36 megawatts, and it is expected to achieve one furnaces and one machine in 2015 and the total installation in the plant will be 5 furnaces and 4 machines, the installed capacity will be 54 megawatts, maximum heating capacity per hour of 420 tons per hour, and two furnaces and two machines will be put into service according to the demand of heat in the new zone.

1-19102914452Q43.jpg


1-191029145010252.jpg

[Fuel gas]
In early 2009, Hangzhou Bay New Zone signed a contract with China Resources Group to supply for the production and life of the new zone. The first phase of China Resources gas project was invested with 100 million yuan and the construction started in September 2009 and100 km of gas pipeline was laid in 2011, supplying gas to 5 industrial enterprises and 42 public users.


[Sewerage drainage]
Drainage system adopts rain-sewage diversion system. the sewer pipe has of about 290 km has been laid and the rain would be drained into the river nearby; the sewage pipes of 156 km have been laid and the sewage collected would be discharged into sewage treatment plant for processing. To 2011, there have been 4 sewage treatment plants in the area: Hangzhou Bay New Zone Sewage Treatment Plant with designed daily capacity of 40000 tons; Northern sewage treatment plant of Cixi with daily processing capacity of 35000 tons; Bleaching and dyeing industrial park sewage treatment plant which was specializing in processing the discharge of bleaching and dyeing enterprises in the industrial part has the processing capacity of around 25000 tons; Supporting sewage treatment plant in electroplating industrial park specialized in preliminary processing of sewage of enterprises in the electroplating has daily processing capacity of 2600 tons and the 60% of processed water would be recycled and 40% would be discharged and the daily discharging is about 1000 tons.

1-191029145353H2.jpg


1-191029145T9B7.jpg

[Port]
In the area of radius of 200 kilometers within the new zone, there are two international ports of Shanghai Port and Ningbo Port. The new zone is 70 kilometers away from Ningbo Port, and 148 km to the north of Shanghai Port. Container terminal of Ningbo Port is the most ideal transshipment port of ocean containers. With a total of 147 routes, it is one of the international container terminals of the 6th generation with best facilities in China; Shanghai Yangshan Port is located in the estuary of the Yangtze River, which is the port with most container lines, dense schedule and wide coverage. Shanghai Port and Ningbo Port are also the most important supporting ports for the modern industry and logistics in the north of Hangzhou Bay.


[Airlines]
With the traffic circle of 1.5 hours centered at the new zone, there are four international airports with international airlines (Ningbo Lishe International Airport, Hangzhou Xiaoshan International Airport, Shanghai Hongqiao International Airport, and Shanghai Pudong International Airport) and the first-class air conditions, which are able to provide enterprises with the most efficient transport services. The freight transportation system from Ningbo to the mentioned four airport customs has been established and introduced high-end airline company to set up agents.
In 2013, the new zone has planned general aviation industrial park of 12 square kilometers. The industrial park is located in the northeast of the district, about 5 km away from Hangzhou Bay second channel. The industrial park mainly includes an airport and a number of industry layouts. The long-term planning designed length of runway of the aviation airport is 2200 meters and the park will introduce the manufacturing of aircraft engine and parts, fix base operations (FBO), fuel supply, aircraft maintenance, aircraft hosting and rental, pilot training, and aviation tourism, etc. to build a park of general aviation of the whole industry.
According to the preliminary planning, the new zone will strive to develop the general aviation industry to an industry of billion-level within 10 years and develop it to be a state-level aviation industry area of state-level, operation node of corporate aircraft of Shanghai, Hangzhou and Ningbo time and the social service insurance base of Zhejiang general aviation.

1-19102914594A41.jpg


1-19102915010Qb.jpg

[Highway]
Highway system of Ningbo has entered the stage of comprehensive construction and the island-connecting to the east mainland project would connect Ningbo, Beilun Port and Jintang Island and Zhoushan as a whole; reach Hangzhou and Shanghai to the west by express; reach cities of Fujian and Guangdong by Tongsan Line Express in the south; reach Shanghai directly by Hangzhou Bay Bridge from Ningbo to Jiaxing, Hang-Pu Express and Hu-Hang Express, reach Suzhou and Kunshan by Zuo-Jia-Su Express within 1.5 hours; Ningbo will become the international port city closely connected with Shanghai; and connected to Yong-Jin Express and Jing-Jiu railway (Beijing-Jiuling of Hong Kong) to the southwest. At present, the expresses connecting Hangzhou Bay New Zone to Ningbo, Cixi, Yuyao are Shenhai Express, Luan Express, Huchong Express and east outer shroud etc. Shenhai Express has three exits of Hangzhou Bay New Zone (Cixi), Andong and Xinpu. The Yu-Ci connecting line is in construction and the express alone the north line of Hangzhou Bay is in plan.


[Railway]
The railway of Ningbo Port area reach the forefront of the wharf and connecting to the national railway by Xiao-Yong multi-line; Railway container station of Beilun Port Area has formally carried out sea-railway combined transportation. It is convenient for the inland provinces to carry out transit business at Ningbo Port by railway. Hang-Yong high-speed rail started its construction in December 2008, and plans to complete in December 2010, with Yuci Station which is 25 km away from the new zone which can be accessed directly; The connecting line of Hang-Yong high-speed railway has been included into the plan. In addition, Hangzhou Bay Bridge connecting Shanghai and Ningbo has been included in Medium and Long-term Development Plan of Stare Railway (2010-2020) ", and the Line 3 of the rail transit of Ningbo from downtown to Hangzhou Bay New Zone has been planned and will start its construction recently.

1-1910291502403M.jpg

Road situation in the new zone in 2014
As of April 2014, there are a total of 74 roads, 122 bridge and a total of 200 km of mileage of roads constructed, Including 54 roads and 75 bridges of manufacturing block, basically built up the main frame of road network of "ten horizontal and nine vertical"; The framework infrastructure focus on "one horizontal and five verticals" around Guantang Lake core section of business new city with a total investment of 420 million yuan has been completed, completing 20 roads and form road network framework of "five horizontal and seven vertical".